DORA Metrics

DORA metrics: the four keys of software delivery

DORA metrics are deployment frequency, lead time for changes, change failure rate, and time to restore service. This page gives the definition, the formula, and a worked example for each, lists the reasons the numbers are often wrong, and shows how Oobeya calculates them from production pipelines.

DORA Metrics for Production

Production pipelines · Four metrics with tiers · Lead time breakdown

platform/checkout-service

Development Analytics Metrics are displayed

Git AnalyticsPull RequestsDeployments (DORA)
DORA Metrics for Production

Software delivery performance for production pipelines

Lead Time For Changes (Breakdown)
1w 4dDevelopment time
34m 37sWaiting for deploy
6m 33sDeployment time
Lead Time for Changes
Medium
1w 4d↑ 52.1%

Lead time increased; review where changes wait before production.

Deployment Frequency
High
0.91↓ 48.0%

Production release frequency declined 48% versus the previous period.

Change Failure Rate
Elite
2.4%↑ 2.4%

Change failures increased; review recent releases that required remediation.

Time to Restore Service
High
10h 42mService recovery time

Production service recovery averaged 10h 42m in this period.

Deployment Frequency
Production deployments · 2026Explore the trend

Production deployments fell from 36 in August to 22 in September, while remaining above April’s level.

DORA Metrics for Production in Oobeya, shown with example data: the four metrics with a tier each, the deployment trend, and lead time split into Development Time, Waiting For Deploy, and Deployment Time.

Definition

What are DORA metrics?

DORA metrics are four measurements of how fast and how safely a team delivers software to production: deployment frequency, lead time for changes, change failure rate, and time to restore service. They come from the DORA (DevOps Research and Assessment) research program, now part of Google Cloud. The program publishes its findings in the annual State of DevOps reports and in the book Accelerate (2018).

Deployment frequency and lead time for changes measure throughput. Change failure rate and time to restore service measure stability. The four are read as a set. A team that ships faster while breaking production more often has not improved, and the research found that the strongest teams do well on both sides.

DORA metrics describe one application or service and the team that owns it. They are not a measure of individual developers.

Throughput
Deployment frequency, lead time for changes
Stability
Change failure rate, time to restore service
Source
DORA research program (Google Cloud)
Unit of measurement
One application or service, in production

The four key metrics

Definition, formula, and example for each DORA metric

The definitions follow the DORA research program. Each formula is written in words and followed by a small worked example with made-up numbers, then by the way Oobeya computes the value.

Deployment frequency

Throughput

Deployment frequency is how often a team successfully releases changes to production.

Glossary: deployment frequency
Formula
Successful production deployments ÷ days in the period.
Worked example
A service with 45 successful production deployments in a 30-day period has a deployment frequency of 45 ÷ 30 = 1.5 deployments per day.
In Oobeya
The value is shown as Deployments / day and counts only the pipelines marked as Production. A pipeline run with no new commit or pull request since the previous deployment is not counted as a deployment.

Lead time for changes

Throughput

Lead time for changes is the amount of time it takes a commit to get into production.

Glossary: lead time for changes
Formula
Time the production deployment finished − time of the first commit in that deployment, averaged over the deployments in the period.
Worked example
The first commit is made on Monday at 10:00. The pull request is merged on Tuesday at 15:00. The deployment pipeline starts on Wednesday at 09:00 and finishes at 09:20. Lead time for changes is 47 hours 20 minutes.
In Oobeya
The total is split into Development Time (first commit to pull request merge), Waiting For Deploy (merge to pipeline start), and Deployment Time (pipeline start to successful finish). In the example the split is 29 hours, 18 hours, and 20 minutes.

Change failure rate

Stability

Change failure rate is the percentage of production deployments that cause a failure in production and need remediation, such as a hotfix, a rollback, or a patch.

Glossary: change failure rate
Formula
Production deployments that caused a failure ÷ all production deployments × 100.
Worked example
A team deploys to production 40 times in a quarter. Three of those deployments are followed by a hotfix or an incident. Change failure rate is 3 ÷ 40 × 100 = 7.5%.
In Oobeya
Every production deployment has a health status, Success or Failure. Four things set it to Failure: a hotfix naming pattern in the branch name, commit message, or pull request title, an incident from a connected APM or incident management tool, a call to the Deployment API, or a manual change.

Time to restore service

Stability

Time to restore service is how long it takes to recover from a failure in production.

Glossary: time to restore service
Formula
Average of (time the service was restored − time the failure started) over the failures resolved in the period.
Worked example
Two releases fail in one month. The first is fixed after 40 minutes and the second after 2 hours 20 minutes. Time to restore service is (40 + 140) ÷ 2 = 90 minutes.
In Oobeya
The value is the average time between a failed production deployment and its fix, for failures fixed in the selected period. With no deployment marked Failure there is nothing to average, so failure detection has to be set up first.

DORA’s current guide lists five metrics. It names these four change lead time, deployment frequency, change fail rate, and failed deployment recovery time. The fifth is deployment rework rate: the share of deployments that are unplanned work after a production incident. The Oobeya product screens use the four original names shown above. Source: DORA’s software delivery performance metrics (opens in a new tab).

Performance tiers

How DORA performance tiers work

DORA’s reports have grouped the teams they survey into performance clusters, most often named Elite, High, Medium, and Low. The clusters are recalculated from each year’s survey answers, so the boundary values change from report to report and no single set of numbers is permanent.

Oobeya publishes its own reference bands for each delivery metric on the benchmarks page.

Engineering benchmarks and reference bands
Elite and High
Teams in the top clusters release small changes on demand, get a commit into production quickly, and recover from a failed release fast. Their change failure rate stays low while they do it.
Medium
Teams in the middle release on a schedule instead of on demand. A merged change waits longer for its release, and each release carries more changes.
Low
Teams in the lowest cluster release rarely and in large batches. A failure is harder to trace to one change, so recovery takes longer.
Tiers in Oobeya
Oobeya shows a tier next to each of the four metrics: Elite, High, Medium, or Low. A team sees its level per metric instead of one combined grade, so a strong deployment frequency cannot hide a weak change failure rate.
What a tier says, and what it does not
A tier describes one service over one period. It is a reference point for that team’s own trend. It is a poor basis for ranking teams that own different kinds of systems, such as a mobile app and an internal API.

Measurement errors

Why DORA numbers are often wrong

The formulas are simple. The errors come from deciding what counts as a deployment, a change, and a failure. Each mistake below moves a number without any change in how the team delivers.

Every pipeline run is counted as a deployment

CI builds, test runs, and deployments to staging are pipeline runs too. When all of them are counted, deployment frequency rises without one extra release reaching users.

Production is not defined

Without an agreed list of production pipelines, one team’s number includes staging and another team’s does not. The two numbers then describe different things under the same name.

Lead time starts at the merge

A clock that starts at the pull request merge leaves out the time spent coding and waiting for review. DORA measures from the commit to production, so those stages belong in the number.

Failures are not linked to deployments

Change failure rate needs a record of which release failed. A team with no hotfix convention and no incident tool connected reports 0%, which reflects missing data and says nothing about stability.

Every incident is counted as a failed change

DORA’s current definition, failed deployment recovery time, covers failures caused by a deployment. An MTTR figure that also includes infrastructure or third-party outages answers a different question.

Unrelated services are averaged together

A mobile app released every two weeks and an API deployed ten times a day produce an average that matches neither. DORA metrics are defined per application or service.

In the product

How Oobeya calculates DORA metrics

Oobeya reads commits and pull requests from the Git provider and deployments from the CI/CD tool, then follows each change from its first commit to its production deployment. The pipelines themselves are not modified.

  1. Pipelines are marked as production

    Each deployment analysis in Oobeya is labelled Production or Development. The headline values come from the production pipelines. Development pipelines are reported separately under DORA Metrics for Development, so they never inflate the production numbers.

    CI/CD integrations
  2. Lead time is split into three stages

    Development Time runs from the first commit to the pull request merge. Waiting For Deploy runs from the merge to the start of the deployment pipeline. Deployment Time runs from the pipeline start to its successful finish. The longest stage shows where a change waits.

    Glossary: lead time for changes
  3. Failures are attached to deployments

    A production deployment is marked Failure in one of four ways: a hotfix naming pattern, an incident from a connected APM or incident management tool, a call to the Deployment API, or a manual status. Change failure rate and time to restore service are calculated from those records.

    Glossary: change failure rate
  4. Three Symptoms are raised from the results

    High Lead Time For Changes, Low Deployment Frequency, and High Change Failure Rate appear on a team’s scorecard when the metric crosses its threshold. Administrators set each threshold, and every Symptom lists possible causes and improvement areas.

    Symptoms catalog

The four metrics appear on the Deployments (DORA) tab of each repository under Coding, Review & Delivery, on every team scorecard in Team Health, and on Home. The DORA Metrics Trends charts always cover the last 12 months, whatever date range is selected.

Featured eBook

DORA and Flow Metrics Field Guide

A practical guide for CTOs, VPs, engineering managers, and platform teams who want to connect DORA metrics with flow, quality, and planning data.

Common questions

Questions about DORA metrics

Need to discuss your team or technical setup? Contact us.

What are the four DORA metrics?

The four DORA metrics are deployment frequency, lead time for changes, change failure rate, and time to restore service. The first two measure delivery throughput and the last two measure stability. They were defined by the DORA (DevOps Research and Assessment) research program, now part of Google Cloud.

How is deployment frequency calculated?

Deployment frequency is the number of successful production deployments divided by the number of days in the period. For example, 45 production deployments in 30 days is 1.5 deployments per day. Builds, test runs, and deployments to staging are not counted.

How is lead time for changes calculated?

Lead time for changes is the time from the first commit of a change to the moment that change is running in production. Oobeya reports it as the sum of three stages: Development Time, Waiting For Deploy, and Deployment Time. A change committed on Monday at 10:00 and live on Wednesday at 09:20 has a lead time of 47 hours 20 minutes.

How is change failure rate calculated?

Change failure rate is the number of production deployments that caused a failure, divided by all production deployments, times 100. A team with 40 production deployments and 3 that needed a hotfix or caused an incident has a change failure rate of 7.5%.

What is a good change failure rate?

There is no permanent figure, because DORA recalculates its performance clusters from each year’s survey. Oobeya’s reference bands treat a change failure rate below 15% as Elite, 15% to 30% as Needs Focus, and above 30% as At Risk. A team’s own trend over several periods is the more reliable reading.

What is the difference between time to restore service and MTTR?

Time to restore service measures recovery from a failure in production. DORA’s current name for it, failed deployment recovery time, limits it to failures caused by a deployment. MTTR figures from incident tools often include every incident type, such as infrastructure outages, so the two are comparable only when they count the same events.

Is there a fifth DORA metric?

Yes. DORA’s current guide adds deployment rework rate, the share of deployments that are unplanned work following a production incident. It also renames the other measures to change lead time, change fail rate, and failed deployment recovery time. Oobeya’s Deployments (DORA) screens show the four original metrics.

Why do our DORA metrics look wrong?

Two frequent causes are counting every pipeline run as a deployment and having no agreed definition of production. Both inflate deployment frequency. A change failure rate of exactly 0% usually means failures are not being linked to deployments, because no hotfix convention or incident tool is in place.

How does Oobeya calculate DORA metrics?

Oobeya calculates DORA metrics from the CI/CD pipelines marked as production, without changes to the pipelines. Lead time for changes is split into development, waiting, and deployment time. Failed deployments are detected from hotfix naming patterns, a connected incident tool, the Deployment API, or a manual status, and three Symptoms are raised when a metric crosses its threshold.

Which tools does Oobeya read DORA data from?

Oobeya reads commits and pull requests from GitHub, GitLab, Bitbucket, and Azure DevOps, and deployments from CI/CD tools including GitHub Actions, GitLab CI/CD, Azure Pipelines, Jenkins, and TeamCity. Incidents for change failure rate come from a connected APM or incident management tool.

Do DORA metrics measure individual developers?

No. DORA metrics describe the delivery performance of an application or service and the team that owns it. Oobeya is designed to improve how teams work, not to score individuals; access to data is controlled by roles.

See Oobeya in practice

See DORA metrics calculated from your production pipelines

A walkthrough covers which of your pipelines count as production, how failed deployments are detected, and where lead time is spent between the first commit and the release.