For Agile Coaches

Team-level evidence for retrospectives and coaching

Oobeya gives Agile coaches and Scrum Masters the Symptoms, sprint results, and flow metrics of the teams they work with. Each Symptom comes with its possible causes and improvement areas, so a retrospective starts from what the data shows.

Symptoms in Oobeya

Platform Group

Development, review, delivery, and quality symptoms

Detected automatically for the selected team

Unreviewed PRs
Critical

14 merged PRs without review

Team level · System levelCode Review

Why is this a symptom?

Pull requests are merged without a completed code review, reducing independent checks before changes reach production.

Possible causes

Missing review requirements, bypassed branch rules, and urgent changes can allow pull requests to merge without reviewer approval.

Improvement areas

Require at least one reviewer for protected branches, review bypass exceptions, and track review coverage before merging.

The Symptoms view in Team Health: recurring Symptoms with their causes and improvement areas. Example data.

Definition

What does Oobeya give an Agile coach?

Oobeya gives an Agile coach team-level evidence for retrospectives and coaching. It shows which anti-patterns are active in a team, how the last sprints went, where work waits, and how the team rates its own experience. The data comes from the team’s Git, pull request, pipeline, and work tracking tools, so nobody prepares a report by hand.

Scrum Masters and Agile coaches sign in to the team lead view of the Home page. It lists the active Symptoms and the wins of the teams they lead, and My Organization shows each team’s DORA levels. Oobeya is designed to improve how teams work, not to score individuals; access to data is controlled by roles.

Home view
Symptoms, delivery items, and wins of the teams you lead
Screens
Team Health, Projects & Boards, Resource Allocation, DevEx Surveys, Leagues
Symptoms
15, each with causes and improvement areas
Sprint data
Jira and Azure Boards
DevEx Surveys
9 ready-to-use templates
Follow-up status
Open, On it, Done, Won't fix

Coaching questions

Five coaching questions, and the metric that answers each

Each answer names the screen a coach opens before the conversation. The screens are listed below, and all of them report the team as a unit.

  • Team Health: Symptoms and the team scorecard
  • Projects & Boards: sprints and time in state
  • Coding, Review & Delivery: pull requests and DORA
  • Resource Allocation: utilization by project
  • DevEx Surveys and Leagues
Which anti-pattern keeps coming back?
Team Health lists the Symptoms active for the team. Recurring high rework rate is raised only when the rework rate stays above the threshold for several periods in a row. Each Symptom shows its detection method, possible causes, and improvement areas.
Why did the sprint not finish?
Projects & Boards reads sprints from Jira and Azure Boards. It shows velocity, delivery rate by item count and by effort, planning accuracy, and scope change: the items added and removed after the sprint started.
Where does work wait?
Time in State shows the average time items spend in each workflow state. Reaction time covers the states before work starts, cycle time runs from work started to work completed, and lead time from creation to completion. The Pull Requests tab adds pickup and review time for code.
Is the team overloaded?
Resource Allocation labels each project Underutilized, Optimally Utilized, Slightly Overloaded, or Overloaded. The high weekend activity Symptom is raised when weekend commits and pull requests exceed the threshold. The Work In Progress list shows items open for more than five days.
How does the team experience its own process?
DevEx Surveys has 9 ready-to-use templates. Results show score, participation, topic trends, and comments, next to the system metrics of the same team.

New Personal home page

The Home page for Scrum Masters and Agile coaches

Team leads, Scrum Masters, and Agile coaches see the Symptoms and wins of the teams they lead as soon as they open Oobeya, so the next conversation starts from data.

  • Active team Symptoms, such as unreviewed pull requests or recurring high rework rate
  • Wins for the selected period, such as a rework rate below the company average
  • A personal status on every item: Open, On it, Done, or Won't fix

Worked example

Example: one retrospective, one experiment, one check

The steps follow a single improvement from the Home page to its result. The team and its figures are an illustration, not customer data.

1. Before the retrospective: Home

The coach opens Home on the day of the retrospective for a team of 8. Two Symptoms are active: Oversize pull requests and High code review time. Wins shows a rework rate below the company average for the same period, which goes on the agenda too.

2. In the room: one Symptom on screen

The team opens Oversize pull requests in Team Health. The page shows the detection method, the data that triggered it, the possible causes, and the improvement areas. The team picks one experiment for the next two sprints: split any change above an agreed size.

3. Two sprints later: the result

The Pull Requests tab shows PR size and time to merge for the two sprints. If the Symptom is no longer active, the coach marks the item Done. A DevEx survey on code review shows whether the team feels the difference.

Customer perspectives

Engineering evidence teams can act on

“According to our POC evaluations around IT productivity measurement, Oobeya was the tool that best met our expectations. Its integration flexibility, Symptoms capability, and DORA metrics gave us visibility across nearly 4,000 developers and helped us clearly see inefficient points, including outsourced projects.”
A. D. · Engineering Leader
Turkcell · Telecommunications
“Oobeya provides a comprehensive overview of our SDLC. We can see a wide range of metrics crucial for engineering efficiency by collecting data from different sources like version control, issue management, and deployment tools.”
E. B. · DevOps Chapter Lead
Invicti · Cybersecurity
“What stands out the most with Oobeya is its depth of analysis and insights. It provides automated recommendations based on our team's activity, and the integration with tools like Azure DevOps and SonarQube makes the transition seamless.”
M. I. · DevOps Lead
TEB (BNP Paribas) · Banking

Common questions

Questions Agile coaches ask about Oobeya

Need to discuss your team or technical setup? Contact us.

How do Agile coaches use Oobeya?

Agile coaches open Oobeya before a retrospective or coaching session to see what the team’s own tools recorded. Team Health lists the active Symptoms with their causes, Projects & Boards shows the last sprints, and the Pull Requests tab shows where code waited for review.

Which Oobeya data is useful in a retrospective?

Four things. The first is the list of Symptoms active for the team. The second is sprint results: velocity, planning accuracy, and scope change. The third is time in state, with cycle time and lead time. The fourth is pull request metrics such as pickup time and PR size. Each Symptom also lists improvement areas, which gives the team concrete options to choose from.

Does Oobeya track individual developers?

Oobeya is designed to improve how teams work, not to score individuals; access to data is controlled by roles. Symptoms, sprint metrics, and DORA metrics are evaluated for teams, and the coach’s Home page shows the teams they lead.

Which sprint metrics does Oobeya show?

Projects & Boards shows completed items per sprint, sprint velocity, delivery rate by item count and by effort, planning accuracy, and the items added or removed after the sprint started. Time in State adds reaction time, cycle time, and lead time. The data comes from Jira and Azure Boards.

Where do DORA metrics fit in Agile coaching?

DORA metrics show what happens after the sprint board says done. Deployment frequency and lead time for changes show how quickly finished work reaches production, and change failure rate and time to restore show how stable it is. Lead time is split into development, waiting, and deployment time.

Can Oobeya show whether a team is overloaded?

Yes. Resource Allocation calculates utilization from work items and labels each project Underutilized, Optimally Utilized, Slightly Overloaded, or Overloaded, with configurable thresholds. The high weekend activity and recurring high cognitive load Symptoms add evidence from Git activity.

What are DevEx Surveys in Oobeya?

DevEx Surveys are developer experience surveys run inside Oobeya, with 9 ready-to-use templates. Results show score, participation, topic trends, and comments, and they appear next to the system metrics of the same team.

Do Leagues rank people?

Leagues are built on KPIs the organization chooses. A league is either a team league, where teams earn points on shared KPIs, or an individual league, where contributors earn points on selected KPIs. Both are a way to keep people engaged with an improvement goal.

Can a Scrum Master follow up on Symptoms from one place?

Yes. The Home page lists the active Symptoms of the teams a Scrum Master leads, most urgent first. Each item has a personal status: Open, On it, Done, or Won’t fix. The status is saved in the browser and changes nothing in Oobeya.

See Oobeya in practice

Your team’s Symptoms and sprint data in one walkthrough

The demo covers the team lead Home page, the Symptoms catalog, Projects & Boards, and DevEx Surveys, with a team structure like yours.