Work In Progress
What Is Work In Progress?
Work in progress (WIP) is the number of work items that have been started but not yet finished at a given moment. In software delivery it includes tickets in development, pull requests waiting for review, changes in testing and builds waiting for release. WIP is a count, taken at a point in time or averaged over a period.
Why Work In Progress Matters
Every started item competes for the same people. A developer with five open tasks switches between them and finishes each one later than if they were done in sequence. Items wait longer in every queue, so cycle time rises even though everyone is busy. High WIP also hides problems, because a blocked item is set aside and replaced with a new one instead of being unblocked.
How Work In Progress Is Measured
WIP is the count of items in any "in progress" state on a board. It is usually reported per team, per person and per workflow stage.
Its effect on speed follows Little's Law:
average cycle time = average WIP / average throughput
A team with 12 items in progress that finishes 4 items a week has an average cycle time of 3 weeks. If the team lowers WIP to 8 items at the same throughput, cycle time falls to 2 weeks. Nothing about how fast people work has changed; items simply wait less.
Kanban teams control WIP with explicit limits per column. A column with a limit of 3 accepts no new item until one leaves.
How Oobeya Uses Work In Progress
Oobeya reads work items from Jira and Azure Boards. Projects & Boards lists work in progress as assigned issues that have been in an in-progress status for more than 5 days, next to cycle time and flow efficiency for the same board. Resource Allocation shows utilization by effort or item count, with statuses from Underutilized to Overloaded based on configurable thresholds.
Frequently Asked Questions
What is a WIP limit?
A WIP limit is the maximum number of items allowed in a workflow stage at once. When the limit is reached, the team finishes existing work before starting anything new.
Why does high WIP slow delivery?
With more items open than people can work on, each item spends most of its time waiting. Task switching adds further loss, and cycle time grows in proportion to WIP.
How does WIP relate to cycle time?
By Little's Law, average cycle time equals average WIP divided by average throughput. At constant throughput, halving WIP halves cycle time.