[{"data":1,"prerenderedAt":120},["ShallowReactive",2],{"glossary-page-\u002Fglossary\u002Flead-time-for-changes":3},{"id":4,"title":5,"body":6,"description":107,"extension":108,"meta":109,"navigation":115,"path":116,"seo":117,"stem":118,"__hash__":119},"docs\u002Fglossary\u002Flead-time-for-changes.md","Lead Time For Changes",{"type":7,"value":8,"toc":99},"minimark",[9,15,20,27,31,34,50,54,57,71,74,78],[10,11,12],"glossary-title",{},[13,14,5],"p",{},[16,17,19],"h2",{"id":18},"what-is-lead-time-for-changes","What Is Lead Time For Changes?",[13,21,22,26],{},[23,24,25],"strong",{},"Lead Time for Changes"," measures how long it takes for a code change to move from commit to successful deployment in production. It is one of the four DORA metrics.",[16,28,30],{"id":29},"why-lead-time-for-changes-matters","Why Lead Time For Changes Matters",[13,32,33],{},"This metric helps teams understand delivery efficiency. Lower lead time usually indicates:",[35,36,37,41,44,47],"ul",{},[38,39,40],"li",{},"faster feedback loops,",[38,42,43],{},"less waiting between stages,",[38,45,46],{},"smoother build, test, and release processes,",[38,48,49],{},"better ability to respond to change.",[16,51,53],{"id":52},"how-to-improve-lead-time-for-changes","How To Improve Lead Time For Changes",[13,55,56],{},"Teams usually improve lead time by:",[35,58,59,62,65,68],{},[38,60,61],{},"reducing batch size,",[38,63,64],{},"strengthening CI and deployment automation,",[38,66,67],{},"removing approval or handoff bottlenecks,",[38,69,70],{},"improving review and test turnaround time.",[13,72,73],{},"Lead time should be measured with clear start and end definitions. Otherwise, comparisons become unreliable.",[16,75,77],{"id":76},"related-terms","Related Terms",[35,79,80,87,93],{},[38,81,82],{},[83,84,86],"a",{"href":85},"\u002Fglossary\u002Fdora-metrics","DORA Metrics",[38,88,89],{},[83,90,92],{"href":91},"\u002Fglossary\u002Fdeployment-pipeline","Deployment Pipeline",[38,94,95],{},[83,96,98],{"href":97},"\u002Fglossary\u002Fdeployment-frequency","Deployment Frequency",{"title":100,"searchDepth":101,"depth":101,"links":102},"",2,[103,104,105,106],{"id":18,"depth":101,"text":19},{"id":29,"depth":101,"text":30},{"id":52,"depth":101,"text":53},{"id":76,"depth":101,"text":77},"Lead Time for Changes measures how long it takes for a code change to move from commit to successful production deployment.","md",{"category":110,"tags":111},"L",[112,113,114],"DORA","Engineering Metrics","Software Delivery",true,"\u002Fglossary\u002Flead-time-for-changes",{"title":5,"description":107},"glossary\u002Flead-time-for-changes","V5V1m9U7ogaIbe9dU1aojouBwJuVu87JEboDbzBHC2g",1776167600388]