[{"data":1,"prerenderedAt":160},["ShallowReactive",2],{"glossary-page-\u002Fglossary\u002Fdeployment-freeze":3},{"id":4,"title":5,"body":6,"description":147,"extension":148,"meta":149,"navigation":155,"path":156,"seo":157,"stem":158,"__hash__":159},"docs\u002Fglossary\u002Fdeployment-freeze.md","Deployment Freeze",{"type":7,"value":8,"toc":132},"minimark",[9,15,20,28,32,35,39,42,51,55,68,72,77,80,84,87,91,94,98],[10,11,12],"glossary-title",{},[13,14,5],"p",{},[16,17,19],"h2",{"id":18},"what-is-a-deployment-freeze","What Is a Deployment Freeze?",[13,21,22,23,27],{},"A ",[24,25,26],"strong",{},"deployment freeze"," is a planned period in which a team stops releasing changes to production to lower the risk of an outage. It is also called a code freeze or change freeze, although a code freeze usually stops merges as well as deployments. Typical freeze windows are peak sales days, year-end financial closing, large migrations, and public holidays with reduced on-call staff.",[16,29,31],{"id":30},"why-deployment-freezes-matter","Why Deployment Freezes Matter",[13,33,34],{},"A freeze trades delivery speed for stability during a window when an outage would be most expensive. The cost arrives afterwards. Changes that waited during the freeze are released together, so the first deployment after the freeze is larger and harder to roll back than a normal one. Long or frequent freezes therefore raise the failure risk they were meant to reduce.",[16,36,38],{"id":37},"how-a-deployment-freeze-works","How a Deployment Freeze Works",[13,40,41],{},"A freeze has a start date, an end date, a scope, and an exception rule. The scope names the services or environments that are frozen. The exception rule states who can approve an emergency fix, such as a security patch.",[13,43,44,45,50],{},"Teams enforce a freeze in the release stage of the ",[46,47,49],"a",{"href":48},"\u002Fglossary\u002Fdeployment-pipeline","deployment pipeline",". Common mechanisms are a blocked production stage, a required manual approval, or a calendar check in the change management tool. Development, code review, and deployments to test environments normally continue during the freeze.",[16,52,54],{"id":53},"how-oobeya-uses-deployment-freezes","How Oobeya Uses Deployment Freezes",[13,56,57,58,62,63,67],{},"Oobeya calculates ",[46,59,61],{"href":60},"\u002Fdora-metrics-four-key","DORA metrics"," from the pipelines marked as production, so a freeze is visible in the numbers. Deployment frequency drops to zero for the frozen period in the Deployments (DORA) tab of Coding, Review & Delivery. Lead time for changes rises for every change that waited, and Oobeya splits that lead time into coding time, waiting time, and deployment time. A long freeze can also trigger the low deployment frequency and high lead time for changes ",[46,64,66],{"href":65},"\u002Fsymptoms","Symptoms"," for a team.",[16,69,71],{"id":70},"frequently-asked-questions","Frequently Asked Questions",[73,74,76],"h3",{"id":75},"what-is-the-difference-between-a-code-freeze-and-a-deployment-freeze","What is the difference between a code freeze and a deployment freeze?",[13,78,79],{},"A code freeze stops new changes from being merged into the release branch. A deployment freeze stops releases to production while merging continues.",[73,81,83],{"id":82},"how-long-should-a-deployment-freeze-last","How long should a deployment freeze last?",[13,85,86],{},"A freeze should cover only the period of real business risk, which is often a few days. Every extra day adds more waiting changes to the first release after the freeze.",[73,88,90],{"id":89},"do-deployment-freezes-hurt-dora-metrics","Do deployment freezes hurt DORA metrics?",[13,92,93],{},"Yes. During a freeze, deployment frequency falls and lead time for changes grows. Change failure rate often rises just after the freeze, because the first release contains many changes at once.",[16,95,97],{"id":96},"related-terms","Related Terms",[99,100,101,108,114,120,126],"ul",{},[102,103,104],"li",{},[46,105,107],{"href":106},"\u002Fglossary\u002Fdeployment-frequency","Deployment Frequency",[102,109,110],{},[46,111,113],{"href":112},"\u002Fglossary\u002Fchange-approval","Change Approval",[102,115,116],{},[46,117,119],{"href":118},"\u002Fglossary\u002Frelease-governance","Release Governance",[102,121,122],{},[46,123,125],{"href":124},"\u002Fglossary\u002Fbatch-size","Batch Size",[102,127,128],{},[46,129,131],{"href":130},"\u002Fglossary\u002Frollback","Rollback",{"title":133,"searchDepth":134,"depth":134,"links":135},"",2,[136,137,138,139,140,146],{"id":18,"depth":134,"text":19},{"id":30,"depth":134,"text":31},{"id":37,"depth":134,"text":38},{"id":53,"depth":134,"text":54},{"id":70,"depth":134,"text":71,"children":141},[142,144,145],{"id":75,"depth":143,"text":76},3,{"id":82,"depth":143,"text":83},{"id":89,"depth":143,"text":90},{"id":96,"depth":134,"text":97},"A deployment freeze is a planned period in which a team stops releasing changes to production to lower the risk of an outage.","md",{"category":150,"tags":151},"D",[152,153,154],"Release Management","Software Delivery","Change Control",true,"\u002Fglossary\u002Fdeployment-freeze",{"title":5,"description":147},"glossary\u002Fdeployment-freeze","FZs2YbTEfghdfis6ZP4kb130lMn7HmlYm9kGN513s8A",1795595213662]