[{"data":1,"prerenderedAt":171},["ShallowReactive",2],{"glossary-page-\u002Fglossary\u002Fchange-approval":3},{"id":4,"title":5,"body":6,"description":158,"extension":159,"meta":160,"navigation":166,"path":167,"seo":168,"stem":169,"__hash__":170},"docs\u002Fglossary\u002Fchange-approval.md","Change Approval",{"type":7,"value":8,"toc":144},"minimark",[9,15,20,27,31,34,38,41,63,66,69,73,88,92,97,100,104,107,111],[10,11,12],"glossary-title",{},[13,14,5],"p",{},[16,17,19],"h2",{"id":18},"what-is-change-approval","What Is Change Approval?",[13,21,22,26],{},[23,24,25],"strong",{},"Change approval"," is the step in which an authorized person or group reviews a planned production change and permits or rejects its release. In ITIL the practice is called change enablement, and the reviewing group is often a change advisory board (CAB). In DevOps teams the approval is usually a peer review on the pull request plus automated checks in the pipeline.",[16,28,30],{"id":29},"why-change-approval-matters","Why Change Approval Matters",[13,32,33],{},"Approval exists to stop harmful changes, and it also adds waiting time to every change, harmful or not. A weekly CAB meeting means a fix finished on Tuesday waits until the following Monday to be approved. DORA research found that heavyweight approval by an external board slows delivery and does not lower the change failure rate, while peer review during development is associated with better performance.",[16,35,37],{"id":36},"how-change-approval-works","How Change Approval Works",[13,39,40],{},"Most organizations sort changes into three classes:",[42,43,44,51,57],"ul",{},[45,46,47,50],"li",{},[23,48,49],{},"Standard changes"," are low-risk and pre-approved, such as a routine deployment through the normal pipeline.",[45,52,53,56],{},[23,54,55],{},"Normal changes"," need review before release. The reviewer is a peer, a service owner or a CAB, depending on risk.",[45,58,59,62],{},[23,60,61],{},"Emergency changes"," fix an active incident and follow a shortened path with review after the fact.",[13,64,65],{},"A modern setup records approval where the work happens. The pull request needs one or two approving reviews. The pipeline requires passing tests and security scans. A protected production environment asks for a manual approval from a named group. Each step leaves an audit record that ties the approver to the exact commit.",[13,67,68],{},"Change approval sits between \"code complete\" and \"deployed\" in the software delivery lifecycle.",[16,70,72],{"id":71},"how-oobeya-uses-change-approval","How Oobeya Uses Change Approval",[13,74,75,76,79,80,83,84,87],{},"Oobeya shows how long approval steps hold changes back. On the ",[23,77,78],{},"Deployments (DORA)"," tab, lead time for changes is split into development time, waiting time and deployment time. Waiting time runs from the end of development to the start of the deployment job, which is where approval queues and release windows sit. The ",[23,81,82],{},"Pull Requests"," tab shows pickup and review time for peer approval. The ",[23,85,86],{},"high lead time for changes"," Symptom flags teams whose total passes the configured threshold.",[16,89,91],{"id":90},"frequently-asked-questions","Frequently Asked Questions",[93,94,96],"h3",{"id":95},"what-is-a-change-advisory-board","What is a change advisory board?",[13,98,99],{},"A change advisory board (CAB) is a group that assesses proposed production changes for risk and decides whether they proceed. It is a common control in ITIL-based organizations.",[93,101,103],{"id":102},"does-change-approval-reduce-production-failures","Does change approval reduce production failures?",[13,105,106],{},"Peer review and automated testing do. DORA research found no evidence that approval by an external board lowers change failure rate, and it found that such approval slows delivery.",[16,108,110],{"id":109},"related-terms","Related Terms",[42,112,113,120,126,132,138],{},[45,114,115],{},[116,117,119],"a",{"href":118},"\u002Fglossary\u002Frelease-governance","Release Governance",[45,121,122],{},[116,123,125],{"href":124},"\u002Fglossary\u002Fdeployment-freeze","Deployment Freeze",[45,127,128],{},[116,129,131],{"href":130},"\u002Fglossary\u002Fcode-review","Code Review",[45,133,134],{},[116,135,137],{"href":136},"\u002Fglossary\u002Fchange-failure-rate","Change Failure Rate",[45,139,140],{},[116,141,143],{"href":142},"\u002Fglossary\u002Flead-time-for-changes","Lead Time For Changes",{"title":145,"searchDepth":146,"depth":146,"links":147},"",2,[148,149,150,151,152,157],{"id":18,"depth":146,"text":19},{"id":29,"depth":146,"text":30},{"id":36,"depth":146,"text":37},{"id":71,"depth":146,"text":72},{"id":90,"depth":146,"text":91,"children":153},[154,156],{"id":95,"depth":155,"text":96},3,{"id":102,"depth":155,"text":103},{"id":109,"depth":146,"text":110},"Change approval is the step in which an authorized person or group reviews a planned production change and permits or rejects its release.","md",{"category":161,"tags":162},"C",[163,164,165],"Governance","Release Management","Change Control",true,"\u002Fglossary\u002Fchange-approval",{"title":5,"description":158},"glossary\u002Fchange-approval","8oafI_JU_R0HEgjweeLzojJlwt8g8KSA8dpHaCUI8GY",1795595213082]